Method, system and device for realizing data forward shifting in user terminal switching process
A terminal switching and terminal technology, applied in the communication field, can solve the problems of wasting Un port resources, increasing switching delay, and destroying user experience.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0075] see Figure 4 As shown, in this embodiment, the specific process of UE handover under RN is as follows:
[0076] Steps 400-401: The source RN and the serving gateway perform area restriction acquisition, and the source RN sends a measurement control message to the terminal. During this process, the UE performs data services between the source RN and the serving gateway.
[0077] Steps 402a-402b: the source RN sends uplink resource allocation information to the UE, and the UE sends a measurement report to the source RN.
[0078] Step 403: The source RN makes a judgment based on the measurement report and the RRM information, and decides whether the UE needs to be handed over.
[0079] Step 404a: If it is determined that the UE needs to be handed over, the source RN sends a handover request message to the target node through the D-eNB, which carries necessary information to prepare for the handover on the target side.
[0080] Step 404b: Once the D-eNB detects that the ...
example 2
[0097] see Figure 5 As mentioned above, the specific process of switching in this embodiment is as follows:
[0098] Steps 500-501: The source RN and the serving gateway perform area restriction acquisition, and the source RN sends a measurement control message to the terminal. During this process, the UE performs data services between the source RN and the serving gateway.
[0099] Steps 502a-502b: the source RN sends uplink resource allocation information to the UE, and the UE sends a measurement report to the source RN.
[0100] Step 503: The source RN makes a judgment based on the measurement report and the RRM information, and decides whether the UE needs to be handed over.
[0101] Step 504: If it is determined that the UE needs to be handed over, the source RN sends a handover request message to the target node through the D-eNB, which carries necessary information to prepare for handover on the target side.
[0102] Step 505: The target node performs admission contr...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com