Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Main link restoration control method and switching system

A control method and the technology of the main switch, which are applied in the field of switch systems, can solve problems such as lost data, failure of the switch system to transmit, low reliability of the switch system, etc.

Active Publication Date: 2011-05-11
NEW H3C TECH CO LTD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0018] However, the BF reconfiguration takes at least 3F_S_TOV, that is, about 15 seconds, which will cause the switch system to fail to transmit data or even lose data for a long time, thus making the switch system less reliable.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Main link restoration control method and switching system
  • Main link restoration control method and switching system
  • Main link restoration control method and switching system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0052] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below with reference to the accompanying drawings and examples.

[0053] In the embodiment of the present invention, the switch is divided according to the position of the switch for the failed main link, which can also be regarded as divided according to the role, and can be divided into the following three types:

[0054] The downstream switch whose upstream main link fails, that is, the switch at the downstream end of the failed main link, if the failed main link is a complete main link composed of a direct connection between a non-main switch and the main switch, then the downstream switch of the failed main link is a complete The non-main switch at the end of the main link communicates with the main switch; if the failed main link is the last section of the complete main link formed by cascading the non-master swi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a main link restoration control method and a switching system. The main link restoration control method comprises the following steps of: initiating a first notification message which indicates that a main link fails by an upstream switch of the failed main link, and transmitting the first notification message among switches connected by all normal links; if the first notification message can be transmitted to a main switch, sending a second notification message which indicates that a domain identity (ID) needs to be requested again to all switches by the main switch; if the second notification message can be received by a downstream switch of the failed main link, recording a link in which a port receiving the second notification message is positioned as a new upstream main link, and requesting the domain ID to the main switch sequentially with switches connected with other all normal links again, so that the main link in the switch system is restored; therefore, reconfiguration is not needed to be initiated by the switch system in which the main switch is positioned, the phenomenon that data cannot be transmitted by the switch system in a long period of time required by the reconfiguration is avoided, and the reliability of the switch system is improved.

Description

technical field [0001] The present invention relates to link recovery control technology, in particular to a main link recovery control method and a switch system based on a fiber channel (Fibre Channel, FC) network and capable of realizing main link recovery. Background technique [0002] In the existing switch system based on FC network, a master switch is usually selected by the Build Fiber (BF) configuration between the switches, and other switches are non-master switches. The main link described in this paper It is the link used by the non-master switch to communicate with the master switch. The master link can be a direct link between the non-master switch and the master switch, or a link cascaded through other non-master switches. [0003] For each non-master switch, the master link used to send data to the master switch can be called the upstream master link, and the master link used to forward data from the master switch to the downstream can be called the downstrea...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): H04L12/56H04L29/12H04Q11/00H04L45/02H04L45/28
Inventor 苏楠枝
Owner NEW H3C TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products