Parameter update method and device
A parameter update and data update technology, applied in network data management, digital transmission system, data exchange network, etc., can solve the problems of increasing network burden, affecting the execution efficiency of SNMP management equipment, increasing the stack overhead of SNMP management equipment, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0069] Step 1: The management device issues parameter configuration commands in batches to the network element devices;
[0070] Step 2: The network element device receives the parameter configuration commands issued by the management device in batches; the configuration parameters carried in the received parameter configuration commands are verified; the configuration carried in each parameter configuration command issued to the management devices in batches When the verification of the parameters is successful, each configuration parameter is used to update the locally saved parameters.
Embodiment 2
[0072] In this embodiment, the network element device needs to allocate a main area and a backup area in the memory in advance, the main area is a memory space used to save valid data related to the network element device, and the backup area is a memory space used to temporarily save parameter data ;details as follows:
[0073] Step 1: Before the management device needs to send parameter configuration commands to the network element device in batches, it sends a transaction preparation request to the network element device;
[0074] Step 2: The network element device receives the transaction preparation request issued by the management device, and backs up the parameter data stored in the main area of the memory to the backup area of the memory; optionally, it can send a transaction success start response to the management device;
[0075] Step 3: The management device issues parameter configuration commands in batches to the network element devices;
[0076] Step 4: The...
Embodiment 3
[0079] In this embodiment, the network element device needs to allocate a main area and a backup area in the memory in advance, the main area is a memory space used to save valid data related to the network element device, and the backup area is a memory space used to temporarily save parameter data ;details as follows:
[0080] Step 1: Before the management device needs to send parameter configuration commands to the network element device in batches, it sends a transaction preparation request to the network element device;
[0081] Step 2: The network element device receives the transaction preparation request issued by the management device, and backs up the parameter data stored in the main area of the memory to the backup area of the memory; optionally, it can send a transaction success start response to the management device;
[0082] Step 3: The management device issues parameter configuration commands in batches to the network element devices;
[0083] Step 4: The...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com