A technology for switching off operation and monitoring system, which is applied in information technology support systems, electrical components, circuit devices, etc., can solve the problems of inability to realize the mandatory blocking function of switching off operation, high cost, and small video overview, etc. Quick response ability, alleviate serious deficiencies, and realize the effect of positioning function
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] In the centralized control center, after a simulated preview, the operation sequence of the operation ticket is transferred to the computer key, and the operation ticket is displayed in the client computer of the centralized control center according to the standard ticket format. After the operator arrives at the equipment site, the guardian of the centralized control center will be notified by phone. The guardian will authorize the operation of the computer key on the site through wireless communication on the client side of the centralized control center, and the unlock key of the operator will be issued by the guardian of the centralized control center. The current operation steps can be unlocked on site only after the unlock command is issued. After the operation is completed, the operation result will be automatically sent back to the centralized control center, waiting for the guardian of the centralized control center to confirm. After the guardian confirms that i...
Embodiment 2
[0027] In the substation, after a simulated preview, the operation sequence of the operation ticket is transferred to the computer key, and the operation ticket is displayed in the standard face format in the client computer of the substation. After the operator arrives at the equipment site, he will send a text message on the computer key to inform the guardian, and the guardian will authorize the operation of the computer key on the site through wireless communication on the client side of the substation, and the unlock key of the operator will receive the unlock command issued by the guardian of the substation. Only then can the current operation steps be unlocked on site. After the operation is completed, the operation result will be automatically sent back to the substation, waiting for the confirmation of the guardian of the substation. After the guardian confirms that it is correct, the next operation command is sent, and the on-site operator can proceed to the next oper...