Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

2 results about "Operations order" patented technology

An Operations Order, often abbreviated to OPORD, is a plan format meant to assist subordinate units with the conduct of military operations. An OPORD describes the situation the unit faces, the mission of the unit, and what supporting activities the unit will conduct in order to achieve their commander's desired end state. Normally an OPORD is generated at the battalion, regimental, brigade, divisional, or corps headquarters and disseminated to its assigned or attached elements. The issuance of an OPORD triggers subordinate unit leadership to develop orders specific to the role or roles that the unit will assume within the operation. This more narrowly focused order borrows information from the original, or base, order (for example; weather, phase lines, radio frequencies, etc.) and adds additional details that pertain more to the minutiae of the actions a unit is tasked to conduct in support of the overarching operation.

A method and system for checking a power system power transmission operation order pressing plate

This invention provides a method and system for checking the pressure plate of a power transmission operation ticket. The method includes: counting the total number of pressure plate operation items and pressure plate inspection items for each cabinet in the power transmission operation ticket; determining the percentage of this total number relative to the actual total number of pressure plates for the corresponding cabinet; if this percentage reaches or exceeds a preset threshold, marking the cabinet as a high-risk suspected omission point; when a cabinet is marked as a high-risk suspected omission point, matching the operation task with a preset custom power outage operation task terminology rule library; if the operation task does not meet the preset representative power outage operation task, it is determined to be a real omission; if the operation task meets the preset representative power outage operation task, the operation ticket is determined to be a power outage operation; after all cabinets have been checked, summarizing the check results for all cabinets and outputting an inspection report. This invention achieves a leap from manual item-by-item verification to automatic, second-level screening by the system, significantly shortening the review time and significantly improving the alarm accuracy.
Owner:SHENZHEN POWER SUPPLY BUREAU

A test method and simulation device for automatic switching of a driving mode of a train

The application discloses a kind of automatic car driving mode conversion test method, simulation simulation device, it is related to railway shunting operation technical field.The application provides scheme: after locomotive shunting mode registration, for by manual driving mode conversion to automatic shunting driving mode, construct test scene, test scene is according to the task legality of operation order, the path feasibility of shunting route, the operation safety of parking state as constraint condition to construct scene, each test scene is according to corresponding with corresponding expected result corresponding configuration, according to each test scene, test scene corresponding expected result, automatic shunting driving mode conversion is tested.The application uses "receives effective operation order", "there is correct shunting route", "is in parking state" constraint condition design test scene, from "task legality", "path feasibility" and "operation safety" three aspects construct solution that is both simple and covers comprehensive to "mode conversion" test.
Owner:CASCO SIGNAL (BEIJING) CO LTD