The invention provides a
wharf seaside operation deduction method and
system based on a multi-agent
system, is applied to the technical field of port
wharf operation management, abstracts
wharf physical equipment into agents packaged with attribute, state and behavior logic by constructing a multi-agent collaborative deduction
system based on actual wharf resource configuration, and improves the deduction efficiency of the wharf seaside operation. The
task manager intelligent body analyzes ship operation tasks and dispatches the tasks according to an area matching rule, the
quay crane intelligent body, the field crane intelligent body and the container
truck intelligent body receive the tasks through
asynchronous communication, make decisions autonomously based on own resource states, and determine a task
execution time sequence in combination with a dynamic action time prediction model so as to propel and deduce a logic time axis; the container
truck intelligent body responds to an instruction to simulate container circulation between a
quay crane and a storage
yard, key instructions and state data are written into a
database in real time in the deduction process, a traceable data track is formed, real-time monitoring and post multi-dimensional index analysis are supported, and distributed, dynamic and data-driven high-fidelity deduction of a seaside operation process is achieved.