Online monitoring method for partial discharging of 500 KV cross-linked cable
A technology of partial discharge and cross-linked cables, which is applied in the direction of testing dielectric strength, etc., to prevent sudden operating failures and achieve the effect of condition-based maintenance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0012] The partial discharge signal and low-frequency synchronization signal obtained from the sensor are transmitted to the host (PDCheck) through the coaxial cable. The host performs preliminary processing on the data, extracts the waveform features, and connects with the network card (RJ45) of the portable computer through the network transmission line, optical fiber, and photoelectric converter, and then transmits the features to the computer, and then uses special software to classify, separate and discharge. recognition. Its diagnostic technology includes the following aspects: signal acquisition and transmission, signal feature extraction, expert system identification, fault diagnosis and equipment state estimation.
[0013] 1) First, the discharge pulse waveform is obtained from the device port by a high-speed broadband sampler through a specific sensor (current or voltage coupling), and the waveform characteristics (including characteristic time domain parameters and ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 