Method for replacing 10 kV distribution line lead with load
A power distribution line and load-carrying technology, applied in the direction of overhead lines/cable equipment, etc., can solve problems such as heavy workload, long power outage time, and long power outage maintenance time, so as to maintain and improve the image of the government and the government. The effect of improving social image
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0012] (1) When the wire is damaged and needs to be replaced, it is generally necessary to replace the one-phase wire of the entire tension section. Therefore, the short-circuit points should be respectively selected on the lead wires of the two tension rods in the tension section, and their positions should be close to the side other than the faulty section. In this way, the sheath of the main line of the non-faulty section can not be damaged, and at the same time, it is convenient for paralleling and splitting. If any of the short-circuit points is limited by conditions, you can choose a straight rod that is closer to the fault point, change it to a tension rod and set it as a short-circuit point.
[0013] (2) After the short-circuit point is set, an insulating pay-off trolley is installed on each pole cross arm in the tension section, and an insulating pay-off device is installed on each pole body 3.0 meters from the ground.
[0014] (3) Release the short wiring and the ne...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com