An external hanging and support frame technology, applied in the direction of cranes, etc., can solve the problems of affecting the construction progress, vacant waste of the lower standard section, affecting the construction, etc., and achieve the effect of improving the construction progress, avoiding waste, and avoiding the impact
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach
[0013] The preferred embodiment of the external hanging tower crane bracing frame of the present invention is:
[0014] It includes an upper support structure and a lower support structure, the upper support structure and the lower support structure respectively include two support beams, the two support beams are connected by a secondary beam, one end of the support beam is connected with an embedded part, the The outer sides of the two support beams are connected with horizontal support rods;
[0015] The upper part of the support beam of the lower support structure is connected with a diagonal stay rod, and the lower part of the support beam of the upper support structure is connected with a strut.
[0016] The horizontal support bar includes a long horizontal support bar and a short horizontal support bar, one end of the long horizontal support bar is connected to the end of the support beam, and one end of the short horizontal support bar is connected to the middle of the...
specific Embodiment
[0024] Such as figure 1 , 2 As shown, it includes: supporting beams, secondary beams, diagonal stays, horizontal support rods, struts, etc., and also includes supporting climbing frames for tower cranes (not shown in the figure).
[0025] After the tower crane is used in the independent height condition, it needs to be converted to the climbing condition in time. First of all, according to the predetermined attachment point position of the tower crane, during construction, the embedded parts of the attachment device should be pre-embedded. The anchor bars of the embedded steel plates of the embedded parts should be firmly spot-welded with the steel bars of the original structure to prevent displacement during concrete pouring. bit. Then weld the connecting corbel on the embedded steel plate, the positioning and elevation of the corbel must be strictly controlled
[0026] After the corbels are welded, use the ZSL1000 tower crane to install the lower support beam first, hoist...