System for managing construction project contracting

A construction project, control and management technology, which is applied in the field of system control and management of engineering construction project contracting, can solve problems such as difficult schedule and cost effective control management, and achieve the effect of improving core competitiveness

Inactive Publication Date: 2013-03-06
大连博特软件科技有限公司
View PDF2 Cites 30 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the embodiments of the present invention is to provide a system for controlling and managing the contracting of engineering construction projects to solve the problem that the

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • System for managing construction project contracting
  • System for managing construction project contracting
  • System for managing construction project contracting

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0023] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0024] The design idea of ​​the present invention is: the engineering construction project contracting management system not only integrates the international advanced project management thought, but also combines the management and standards with Chinese characteristics; fully refers to the terms of PMI and FIDIC, and uses mature IT technology The integration of management theory, domestic infrastructure management regulations and habits, and the wisdom of engineering experts is a powerful assistant for enterprises to improve project management level and competitiveness.

[0025] The whole system ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a system for managing construction project contracting. The system centers on progress and cost control under restraining of contracts and provides open interfaces. With an enterprise-level distributed architecture based on .NET standard, project tasks are completed within limited time, under limited resources (such as manpower, material and machinery), at the cost as low as possible and at the speed as high as possible. The requirements of enterprises for managing project contracting are met. The system for managing construction project contracting has fine basis of market demand.

Description

technical field [0001] The invention belongs to the technical field of construction engineering, in particular to a system for controlling and managing contracting of engineering construction projects. Background technique [0002] Since engineering general contracting and project management are based on the theory of system engineering, cybernetics and information theory, and adopt the earned value principle, information integration technology and matrix management structure, and use highly specialized, scientific and market-oriented means to manage the project Implement dynamic, quantitative management and effective control in the whole process of construction, such as progress, cost, quality, resources, finance, risk and safety, so as to achieve the best investment benefits. At present, engineering companies and project management companies in developed countries have established their own engineering project management systems. [0003] The general contracting and proje...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q50/08
Inventor 张小红
Owner 大连博特软件科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products