Scheduling method for elevator group control system
A scheduling method and elevator technology, applied in elevators, transportation and packaging, etc., can solve problems such as low elevator operation efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0037] The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0038] The invention solves the scheduling problem in the elevator group control system by adopting the method of predicting and controlling the risk leading to low elevator operating efficiency. The invention also belongs to the method for forecasting the future service demand. The difference is that the present invention does not predict possible service requirements, but predicts which service requirements will have a great impact on system performance, so as to plan a set of operation plans that avoid risks as much as possible.
[0039] 1. Basic structure
[0040] see figure 1 , the system structure of the present invention is an elevator dispatching logic control system composed of a decision-making module, a cost estimation module and a risk calculation module. Through the elevator scheduling logic control system, whenever there is a...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 