Method for subgrade filling of peat soil subgrade by sea sand
A soil foundation and sea sand technology, applied in the directions of roads, roads, buildings, etc., can solve problems such as wheel trapping, and achieve the effects of easy operation, not easy to be washed by rain, and fast construction speed.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0027] A kind of method adopting sea sand to carry out roadbed filling to peat soil foundation, it comprises following process:
[0028] 1) Construction stakeout
[0029] After the base compaction test is accepted, the guideline points and benchmark points are controlled according to the route measurement, and the middle line and side line piles (50cm extra wide on each side) are set out, and the height of the middle and side line piles is measured and set every 20 meters, that is, the center line , The position elevation of the sideline.
[0030] 2) Sea sand transportation
[0031] Use dump trucks to transport sea sand from the sea sand stock yard to the construction site, plan the transportation route in advance, and assign a traffic coordinator at the intersection where the line of sight is not clear to direct the vehicles to pass safely.
[0032] 3) Temporary transportation access road laying for subgrade filling
[0033] The subgrade under construction is difficult for...
PUM
Property | Measurement | Unit |
---|---|---|
Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com