Communication equipment and method for achieving out-of-band monitoring and management, and master-slave switching method
A technology of communication equipment and out-of-band monitoring, which is applied in the direction of data exchange network, digital transmission system, and error prevention. efficiency effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0036] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be described in detail below through specific embodiments and with reference to the accompanying drawings.
[0037] Compared with the prior art, the present invention adds a field programmable gate array FPGA to the main control card, and the FPGA is connected to the CPU of the main control card through a local bus local bus, and is connected to the single-chip microcomputers of each switching card and line card by using the UART bus. , that is to use their own independent serial bus UART, which is specially used to transmit monitoring and management information, and all management data received and sent through each UART interface is specially processed by the FPGA. A separate The serial bus UART does not affect each other, so that the management data between the main control card and each managed board can be interacted in real time and processed ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com