Preparation method of outer membrane of steel plate or steel rail detection wheel
A technology for detecting wheels and rails, applied in coating and other directions, can solve the problems of low production efficiency, high cost, poor product dialysis, etc., and achieve the effects of short production time, long service life and good dialysis
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0015] A method for preparing the outer film of a steel plate or rail detection wheel, the specific operation process is as follows:
[0016] Put polyurethane as raw material into the production equipment for injection molding: the first zone is 185 degrees Celsius, the second zone is 175 degrees Celsius, and the third zone is 165 degrees Celsius; the molding of the product goes through three injection processes: the pressure of the first stage injection is 100 kg, and the speed is 40m / s, the time is 9.0 seconds, the pressure after putting into the storage is 85 kg, the speed is 55m / s, and the injection length is 30mm; The pressure after feeding is 95kg, the speed is 65m / s, and the injection length is 120mm; the pressure of the storage material during the three-stage injection is 80kg, the speed is 45m / s, and the injection length is 123mm; after that, the process of holding the pressure link: pressure value It is 90 kg, the speed is 50m / s, and the time is 4.0 seconds. The pr...
Embodiment 2
[0018] A method for preparing the outer film of a steel plate or rail detection wheel, the specific operation process is as follows:
[0019] Put polyurethane as raw material into the production equipment for injection molding: the first zone is 200 degrees Celsius, the second zone is 170 degrees Celsius, and the third zone is 160 degrees Celsius; the molding of the product goes through three injection processes: the pressure of the first stage injection is 90 kg, and the speed is 40m / s, the time is 10.0 seconds, the pressure after putting into the storage is 80 kg, the speed is 55m / s, and the injection length is 35mm; The pressure after feeding is 90kg, the speed is 65m / s, and the injection length is 140mm; the pressure of the storage material during the three-stage injection is 90kg, the speed is 45m / s, and the injection length is 123mm; after that, the process of holding the pressure link: pressure value It is 90 kg, the speed is 50m / s, and the time is 4.0 seconds. The pr...
Embodiment 3
[0021] A method for preparing the outer film of a steel plate or rail detection wheel, the specific operation process is as follows:
[0022] Put polyurethane as raw material into the production equipment for injection molding: the first zone is 190 degrees Celsius, the second zone is 180 degrees Celsius, and the third zone is 170 degrees Celsius; the molding of the product goes through three injection processes: the pressure of the first stage injection is 95 kg, and the speed is 40m / s, the time is 10.0 seconds, the pressure after putting into the storage is 90 kg, the speed is 55m / s, and the injection length is 35mm; The pressure after feeding is 100kg, the speed is 65m / s, and the injection length is 140mm; the pressure of the storage material during the three-stage injection is 85kg, the speed is 45m / s, and the injection length is 123mm; after that, the process of holding the pressure link: pressure value It is 95 kg, the speed is 50m / s, and the time is 3.0 seconds. The p...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More