A technology of intelligent substation and communication status, applied in the field of electric power engineering, can solve the problems of poor real-time performance, low reuse rate and efficiency, and high integration cost, and achieve the effect of facilitating implementation, reducing system integration cost, and overcoming high integration cost.

Active Publication Date: 2013-09-25
ELECTRIC POWER RES INST OF GUANGDONG POWER GRID
View PDF2 Cites 30 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Based on this, it is necessary to provide a smart substation GOOSE communication status monitoring method and monitoring equipment for t

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method and device for monitoring GOOSE communication status of intelligent substation
  • Method and device for monitoring GOOSE communication status of intelligent substation
  • Method and device for monitoring GOOSE communication status of intelligent substation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0020] The specific implementation of the method for monitoring the GOOSE communication state of the smart substation of the present invention will be described in detail below in conjunction with the accompanying drawings.

[0021] see figure 1 , figure 1 It is a flow chart of the smart substation GOOSE communication state monitoring method of an embodiment, which mainly includes the following steps:

[0022] Step S1: Obtain the SCD file of the smart substation, configure the GOOSE configuration file of each IED device in the smart substation according to the SCD file, and download it to the corresponding IED device.

[0023] Step S2: Generate a GOOSE message corresponding to the IED device according to the GOOSE configuration file.

[0024] Step S3: Obtain the GOOSE message of the IED device to be monitored by subscription.

[0025] Step S4: Detecting the GOOSE communication state of the IED device according to the GOOSE message;

[0026] Step S5: Carrying out a correspo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a method for monitoring GOOSE communication status of an intelligent substation. The method comprises the steps of obtaining a SCD file of the intelligent substation, configurating a GOOSE configuration file of each IED device of the intelligent substation according to the SCD file, and downloading the GOOSE configuration files to the corresponding IED devices; generating GOOSE messages corresponding to the IED devices according to the GOOSE configuration files; obtaining the GOOSE messages, required to be monitored, of the IED devices in a subscription mode; detecting the GOOSE communication status of the IED devices according to the GOOSE messages; conducting warnings on the corresponding abnormal status according to the detection result. The invention further provides a device for monitoring the GOOSE communication status of the intelligent substation. With the technology of the method and device for monitoring the GOOSE communication status of the intelligent substation, real-time detection on the GOOSE communication status can be achieved, the corresponding warnings can be carried out according to the detection abnormal result, system integration cost can be reduced, the code reuse rate and the communication efficiency are high, and the method and device is convenient to achieve and has good application prospects.

Description

technical field [0001] The invention relates to the technical field of electric power engineering, in particular to a monitoring method and monitoring equipment for the GOOSE communication state of an intelligent substation. Background technique [0002] At present, the smart substation marked by the IEC61850 standard has become an important part of the smart grid construction. Among them, GOOSE communication is widely used in interval five-proof interlocking, fast sending and receiving of status signals and sending and receiving of tripping instructions. There are two major problems in the application of GOOSE: One is to ensure the real-time performance of GOOSE communication, and the other is real-time monitoring of GOOSE communication status. [0003] The existing GOOSE communication status monitoring technology generally uses the GOOSE receiving and analyzing module to simply judge whether the GOOSE message has not been received for a long time, whether the GOOSE message...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): H02J13/00
CPCY04S10/16Y04S10/18Y04S40/128Y02E60/00
Inventor 黄曙王红星马凯陈炯聪冯善强胡春潮谈树峰禤文健张晓悦侯艾君
Owner ELECTRIC POWER RES INST OF GUANGDONG POWER GRID
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products