Method for determining safe distance between concealed karst cave and newly built mountain tunnel
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- CHINA STATE CONSTRUCTION ENGINEERING CORPORATION
- Publication Date
- 2014-02-12
- Estimated Expiration
- Not applicable · inactive patent
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of tunnel engineering, in particular to a method for determining a safe distance between a concealed karst cave and a newly built mountain tunnel. Background technique
[0002] The current research on the construction of karst tunnels is deepening, and the construction of tunnels in karst areas is booming. When there are hidden karst caves around the tunnel, how to reasonably determine the safe distance between them is a very difficult technical problem. It is related to whether the tunnel can Smooth construction and safe operation determine the length and buried depth of the tunnel to a certain extent. The smaller the distance between the two, the smaller the distance between the tunnel and the karst cave. The shorter the tunnel, the lower the project cost, but the danger of tunnel instability Sex is also greater.
[0003] At present, the engineering design of the safety distance between hidden karst caves...