A construction method and a buttress-type technology, which is applied to sheet pile walls, artificial islands, water conservancy projects, etc., can solve the problems of increased construction land, increased support works, and large land occupation of retaining walls to achieve improved reliability. Sexuality, saving engineering quantity and cost, and reducing engineering cost

Active Publication Date: 2015-07-15
BC P INC CHINA NAT PETROLEUM CORP +1
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] The reinforced soil retaining wall is to add tension bars to the soil, and use the friction between the tension bars and the soil to improve the deformation conditions of the soil and improve the engineering properties of the soil, so as to achieve the purpose of stabilizing the soil. It is used for filling The filling height should not be greater than 10 meters when soil is filled, and this form of retaining wall occupies more land
[0007] The gravity retaining wall uses the self-weight of the wall to resist the earth pressure. When it is used for high-fill retaining, the balance-weight retaining wall is generally used. When it is used for filling, the filling height should not be greater than 8 meters, and it occupies a lot of land.
[0008] At present, the maximum fill height of the conventional support structure used in the filling area should not exceed 15 meters. For the above-mentioned support structures for fills with a height of more than 15 meters, special design is required, and there are limitations in the amount of support work. Substantial increase or substantial increase in engineering construction land

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] The construction method of the buttress type retaining wall with anchor piles includes the following steps:

[0022] Step 1. Construction of anti-slide piles: During the construction of anti-slide piles, the connecting bars and anchor cable tunnels with the retaining boards are reserved to facilitate the construction of the retaining boards and anchor cables in the next step.

[0023] The center distance of the anti-sliding pile is 6 meters, and the stressed steel bars of the anti-sliding pile are arranged in two rows on the side of the air surface, and each two forms a bundle. 1 / 3 of the steel bars are arranged throughout the length, and 1 / 2 of the steel bars are arranged at a distance of 4m from the top of the pile. 1 / 6 of the steel bar is cut off at 1m from the top of the pile to save the amount of steel bar.

[0024] Since this type of retaining wall is used for high fill retaining over 15 meters, the length of the piles is all over 20 meters. Set up a concrete dec...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method of an anchor pile counterfort retaining wall. Firstly, the construction of a slide-resistant pile is carried out before filling; a retaining plate, a wall toe bottom plate and a rib plate are constructed after the construction of the slide-resistant pile; anchor cable ducts are reserved in the rib plate of the counterfort retaining wall; anchor cables pass through the reserved ducts of the rib plate; a first stage of prestress is applied after the strength of concrete meets the design requirement, and then layered filling, grinding and tamping are carried out; the prestress is synchronously applied in the filling process. The construction method has the beneficial effects that the advantages of two support structures of a pile plate retaining wall and a counterfort retaining wall are effectively combined together by installing the anchor cables inside the reserved ducts in the rib plate so as to form a novel support structure, which is applicable to a filling slope support of which the height exceeds 15m. Therefore, the engineering cost can be greatly reduced, the reliability of engineering is improved, and the method adapts to greater filling height.

Description

technical field [0001] The invention relates to a construction method of an anchor-stayed buttress-type retaining wall. Background technique [0002] With the rapid development of my country's economic construction, land resources are becoming more and more scarce. How to use the unusable land and save land in engineering construction are problems that must be solved in engineering construction. [0003] The commonly used methods for the treatment of high fill slopes include pile-slab walls, reinforced soil retaining walls, buttress retaining walls and gravity retaining walls. [0004] The sheet pile wall is a soil retaining structure formed by an upright slat-like member that uses anchor piles as the main force-bearing member to resist lateral earth pressure. When used for filling support, the filling height should not be greater than 15 meters. [0005] The buttress-type retaining wall uses the vertical plate and the buttress to bear the bending moment and shear force gen...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D29/02E02D5/76
Inventor 亢会明辜利江李束为康胜卿春和郭涵宇吴有亮于长杰邓艳潘如升柴国良曹昱刘玉国梁国卿李欣张晓光王彬全赵普向阳符枝华何德伟李志为宋文平邹勇袁朝银
Owner BC P INC CHINA NAT PETROLEUM CORP