Ground Treatment Method Based on Dynamic Accurate Control of Uneven Settlement
A precise control and foundation treatment technology, applied in soil protection, infrastructure engineering, construction, etc., can solve problems such as unevenness, achieve good water permeability, reduce post-construction settlement, and large permeability coefficient
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0036] The bearing layer (hard crust) of the natural foundation in a certain area is relatively thin, and the soil with a buried depth of about 4m to 20m is a muddy clayey soil with high compressibility, high sensitivity, low strength, and low permeability, with high water content and porosity. Large, with a small soil compression modulus and a thickness of 10m to 25m, it is the main weak underlying layer of the natural foundation. Now a residential building with a length of 38m, a width of 21m and a height of 32m needs to be built on this foundation. Since the bearing layer is thin and the underlying soft soil layer is thick, in order to improve the bearing capacity of the foundation and accurately deal with the problems caused by the uneven settlement of the foundation, the foundation treatment method based on the dynamic and accurate control of uneven settlement can be used to treat this kind of Engineering needs to be processed.
[0037] The permeable piles are arranged wi...
example 2
[0040] A 5-story brick-and-concrete office building with a frame structure in a certain unit, with a plan size of about 76×18m and a construction area of 3900m 2. The geological conditions from top to bottom are miscellaneous fill, silty clay, silty silty clay, silty clay and silty clay. The maximum thickness of clay is 2.5m, and the thickness of silty clay is 3.5m~5.2m. In order to prevent and deal with the problems caused by uneven settlement of the foundation, the foundation treatment method based on the dynamic and precise control of uneven settlement can be used to treat the foundation.
[0041] The permeable piles are arranged with pipe piles, the pile caps are connected to the drainage pipes (branch pipes of the vacuum pipe network) and sealed with the prefabricated permeable piles, and the piles are driven below the ground water level. The foundation is divided into unit areas, and each unit area is composed of 8 to 20 adjacent piles, and is equipped with a vacuum ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com