Elevator group management system
A management system and elevator group technology, applied in sustainable buildings, elevators, transportation and packaging, etc., can solve the problems of low energy saving effect and achieve the effect of improving energy saving effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 example
[0050] In this embodiment, an example of an elevator group management system capable of reducing power consumption will be described.
[0051] figure 1 It is a control block diagram of the entire elevator group management system of this embodiment. The individual elevator control devices 21A-21C of each elevator control the operation of K elevator cars 22A-22C, and the group management control section 1 performs unified control of each individual elevator control device.
[0052] The hall call signals input by the hall call (elevator hall call) registration devices 3A and 3B installed on each floor of the building are also transmitted to the group management control section 1. Here, the hall call registration devices 3A and 3B are devices that call elevators using, for example, up and down buttons.
[0053] Each elevator car 22A-22C has destination floor registration apparatus 23A-23C in a car, and load sensor 24A-24C in a car, respectively. In addition, it detects the information ...
no. 2 example
[0132] As the elevator group management system of the present invention, it not only performs the allocation of elevator cars that reduce power consumption, but also considers how to reduce the waiting time of passengers, thereby providing an efficient elevator group management system.
[0133] In this embodiment, an example of the elevator group management system is described as follows: Not only can the overall power consumption of the elevator car be reduced, but also the waiting time evaluation index and the energy saving evaluation index can be set to the same dimension, thereby making it easy to set The weighting coefficient in the comprehensive evaluation index.
[0134] Image 6 It is a control block diagram of the entire elevator group management system of this embodiment.
[0135] In the following description, the structure and function figure 1 The same parts as described in the elevator group management system 1 are given the same symbols, and their descriptions are omitt...
no. 3 example
[0151] In this embodiment, the following building elevator group management system is taken as an example for description: not only can the overall power consumption of the elevator car be reduced, but also the waiting time evaluation index can be set to the same dimension as the energy saving evaluation index, which can be easily set Set the weighting coefficient of the comprehensive evaluation index, and can also cooperate with the BEMS (Building and Energy Management System) to set the allowable value of waiting time and the weighting coefficient of the comprehensive evaluation index by BEMS.
[0152] Picture 9 It is a control block diagram of the entire elevator group management system of this embodiment.
[0153] In the following description, the structure and function figure 1 The same parts as described in the elevator group management system 1 are given the same symbols, and their descriptions are omitted.
[0154] The BEMS server 4 has a waiting time allowable value setting...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com