Installation method for annular steel structure
An installation method and steel structure technology, applied in building structure, building material processing, construction, etc., can solve the problems of vertical deformation and large load, shorten the installation period, and reduce installation costs, so as to improve installation efficiency and shorten the installation time. Effect of installation cycle and construction cost reduction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] figure 1 It is a structural schematic diagram of the temporary support frame 200 used in the installation of the ring steel structure 100 in this embodiment. Attached below figure 1 The structure of the temporary support frame 200 in the installation of the ring steel structure 100 will be described in detail.
[0025] The annular steel structure 100 includes a main ring part 12 on the support surface 11 and a top ring part 13 connected to the opening of the main ring part 12, wherein the main ring part 12 includes several main ring segments connected in sequence. The temporary support frame 200 includes two groups of first temporary support frames 21a and 21b arranged in the ring of the main ring portion 12. connection, the other ends of the first temporary support frames 21a and 21b are respectively connected to the main ring segments 121c and 121d near the opening of the main ring part 12, and the two groups of first temporary support frames 21a and 21b are symmetr...
Embodiment 2
[0033] This embodiment is the installation method of the annular steel structure 100 of Embodiment 1, combined below Figure 1 to Figure 2 The installation method of the ring steel structure 100 will be described in detail.
[0034] Step a: hoist and install the main ring segments in sequence to form the main ring part on the support surface, and install them in the ring of the main ring part to form two sets of first temporary support frames, and the two sets of first temporary support frames are symmetrical It is arranged on both sides of the axis of the main ring part; specifically, it includes the following steps:
[0035] Step a1: Install two sets of main ring segments 121a and 121b symmetrical about the axis ax on the supporting surfaces 11 on both sides of the main ring part 12 with the axis ax;
[0036] Step a2: install temporary support sections on the two sets of main ring segments 121a and 121b in step a1 respectively;
[0037] Step a3: In order to ensure the latera...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com