Side slope gradient control method in deep foundation pit excavation process

A control method and technology for deep foundation pits, applied in excavation, infrastructure engineering, construction, etc., can solve problems such as insufficient slope rate of foundation pit, side slope cracking, foundation pit collapse, etc., and achieve slope repair efficiency and slope rate. The effect of high accuracy, saving labor costs and shortening the construction period

Active Publication Date: 2014-07-02
SHANDONG GOLDENCITY CONSTR
View PDF7 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The existing method of controlling the slope ratio of deep foundation pit excavation is to use the method of hanging the vertical line aligned with the lower edge of the foundation pit after the excavation of the foundation pit is completed, and roughly measure the level from the lower edge of the foundation pit to the upper edge. Calculate the slope rate after the distance is accurate, so the design condition of layered excavation and layered support for deep foundation pits cannot be realized, and the slope rate of the foundation pit is seriously insufficient and the slope cracks, and even the foundation pit collapses. ACCIDENT

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Side slope gradient control method in deep foundation pit excavation process
  • Side slope gradient control method in deep foundation pit excavation process
  • Side slope gradient control method in deep foundation pit excavation process

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] The present invention will be further described below in conjunction with accompanying drawing:

[0029] Such as Figure 1 ~ Figure 4 As shown, the method for controlling slope slope rate during excavation of deep foundation pit according to the present invention takes the following steps:

[0030] 1) Positioning and setting out of deep foundation pits: According to the construction design plan of deep foundation pit 3 support, lime powder spreading lines are used to determine the positions of the upper edge 1 of the foundation pit and the lower edge 2 of the foundation pit.

[0031] 2) Deep foundation pit layered excavation: according to the layered excavation depth of the deep foundation pit 3 support construction design plan, excavate along the edge line 2 of the lower opening of the foundation pit with an excavator, and after the excavation is completed, use The excavator roughly repairs the side slope 4 of the foundation pit, but the remaining soil with a thicknes...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention belongs to the technical field of building deep foundation pits, and particularly relates to a side slope gradient control method in a deep foundation pit excavation process. The side slope gradient control method is characterized by including the steps: 1) deep foundation pit positioning and paying off; 2) deep foundation pit hierarchical excavation; 3) standard side slope groove construction; 4) piling horizontal reinforcement piles; 5) side slope gradient standard steel wire hanging; 6) slope repairing horizontal steel wire hanging; 7) precise slope repairing; 8) deep foundation pit timbering. By means of the construction process, including hierarchical excavation, hierarchical slope repairing and hierarchical timbering, matched with deep foundation pit timbering design conditions, the side slope gradient and integral stability of the foundation can meet design requirements; steel wires are tensioned on the side slope to serve as slope repairing control lines and approximately insusceptible to wind force, and whether the side slope gradient at any position of the slope face is accurate or not can be detected; a slope gradient detection ruler is used for detecting construction standard slope gradient grooves, a slope repairing control method of hanging slope repairing horizontal steel wires is adopted, and consequently large-area slope repairing operations on a same excavation level can be conducted, and high slope repairing efficiency is achieved.

Description

technical field [0001] The invention relates to a method for controlling the slope ratio of a deep foundation pit during excavation, and belongs to the technical field of building deep foundation pit support. Background technique [0002] At present, underground garages are generally installed in construction engineering design, so the construction process must first carry out deep foundation pit excavation and support construction. Whether the slope ratio control of deep foundation pit excavation is accurate or not is one of the key factors affecting the stability of deep foundation pit slope. The existing method of controlling the slope ratio of deep foundation pit excavation is to use the method of hanging the vertical line aligned with the lower edge of the foundation pit after the excavation of the foundation pit is completed, and roughly measure the level from the lower edge of the foundation pit to the upper edge. Calculate the slope rate after the distance is accura...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D17/20E02D17/04
Inventor 贾华远马冲司纪伟贾毅王树威马洪军
Owner SHANDONG GOLDENCITY CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products