The invention discloses a railway precast beam full-period digital delivery and
disease tracing method and
system, and the method comprises the following steps: S1, collecting and sorting precast beam data, and building an IFC
entity model based on the data; s2, pre-burying a two-dimensional code plate and an RFID tag on the precast beam, and recording the
digital identity of the precast beam; s3, obtaining the completion coordinate of the precast beam, and binding the
digital identity of the precast beam with the completion coordinate at one time; s4, performing block chain evidence storage on the application data of the precast beam; s5, developing a front-end APP, and judging whether the precast beam meets a
traceability condition or not; s6, all data of the precast beam meeting the
traceability condition are called, and
root cause judgment is conducted based on the IFC
entity model. According to the method, by establishing the IFC standard
data link which runs through design-production-operation and maintenance, data barriers of links of design, production and operation and maintenance can be broken through, data run-through is achieved, data islands are avoided, and comparison time consumption is greatly shortened.