[0039] See Figure 1-2 , Shows the anchoring method for the coal mine roadway floor of the present invention.
[0040] The anchoring method for the floor of the coal mine roadway includes the following steps:
[0041] Step 1: Dig and dig a number of parallel reverse arched trenches 3 on the floor of the roadway 2;
[0042] Wherein, the inverted arch groove 3 is semi-elliptical and is arranged perpendicular to the axis of the roadway. In some preferred embodiments, the width is about 300-500 mm.
[0043] Step 2: Set a plurality of anchor cable boreholes perpendicular to the arc at the bottom of the groove 3 in the reverse arched groove 3, and lower the hollow grouting anchor cable 8 with the grouting pipe 7 in each anchor cable borehole. And seal the hole. The pressure-bearing arch structure 5 of the bottom plate is formed by grouting and anchor cable prestressing. It is also necessary to set a braid at a distance from the orifice to the bottom of the hole and use a cementitious mater...