Reliability Verification Method of 380V Mobile Emergency Power Supply in Nuclear Power Plant
A technology of emergency power supply and verification method, which is applied in the field of nuclear power, can solve the problems that the performance of the mobile emergency power supply cannot be fully verified to meet the design requirements, there is no water injection test for the shaft seal of the on-load safety injection pump, and the lack of real simulation operation verification and inspection, etc., to achieve Effects of improving defense-in-depth capabilities and enhancing reliability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0045] The process flow of the reliability verification method of the 380V mobile emergency power supply of the nuclear power plant in the preferred embodiment of the present invention is as follows: figure 2As shown, the method starts at step S10; in step S20, the feasibility analysis of the 380V mobile emergency power supply with the on-load main pump injecting shaft seal water is carried out to determine whether the 380V mobile emergency power supply meets the requirements of the on-load main pump for injecting shaft seal water. Test conditions, output judgment results; when the 380V mobile emergency power supply satisfies the test conditions for the on-load main pump to inject shaft seal water, in step S30, carry out a test with a rated load on the 380V mobile emergency power supply, and output the load capacity test parameters, Judging the load capacity of the 380V mobile emergency power supply according to the load capacity test parameters, and output the load capacity j...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 