Reliability Verification Method of 6.6kv Mobile Emergency Power Supply in Nuclear Power Plant
A technology of emergency power supply and verification method, applied in the field of nuclear power, can solve the problems of inability to fully verify that the performance of 6.6kV mobile emergency power supply meets design requirements, lack of real simulation operation verification and inspection, etc. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0046] The reliability verification method process of the 6.6kV mobile emergency power supply of the nuclear power plant in the preferred embodiment of the present invention is as follows: figure 1As shown, the method starts from step S10; in step S20, the feasibility analysis of the 6.6kV mobile emergency power supply on-load auxiliary feedwater pump is carried out, and whether the output 6.6kV mobile emergency power supply meets the test conditions of the on-load auxiliary feedwater pump is judged Result; when the 6.6kV mobile emergency power supply satisfies the test conditions of the on-load auxiliary feed water pump, in step S30, the 6.6kV mobile emergency power supply set is tested with a rated load, and the load capacity test parameters are output; according to the load capacity test Judging the load capacity of the 6.6kV mobile emergency power supply by parameters, and outputting the load capacity judgment result; when the load capacity of the 6.6kV mobile emergency pow...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 