Reliability validation method of 6.6KV mobile emergency power source of nuclear power station
A technology of emergency power supply and verification method, which is applied in the field of nuclear power, can solve the problems of lack of real simulation operation verification and inspection, and can not fully verify that the performance of 6.6kV mobile emergency power supply meets the design requirements, so as to improve the defense in depth capability and enhance reliability. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0046] The reliability verification method process of the 6.6kV mobile emergency power supply of the nuclear power plant in the preferred embodiment of the present invention is as follows: figure 1As shown, the method starts from step S10; in step S20, the feasibility analysis of the 6.6kV mobile emergency power supply on-load auxiliary feedwater pump is carried out, and whether the output 6.6kV mobile emergency power supply meets the test conditions of the on-load auxiliary feedwater pump is judged Result; when the 6.6kV mobile emergency power supply satisfies the test conditions of the on-load main pump shaft seal water injection pump, in step S30, the 6.6kV mobile emergency power supply set is tested with a rated load, and the load capacity test parameters are output; The load capacity test parameters judge the load capacity of the 6.6kV mobile emergency power supply, and output the load capacity judgment result; when the load capacity of the 6.6kV mobile emergency power sup...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 