Intelligent early warning and control system for major network project cost investment
A technology of engineering cost and control system, applied in the direction of resources, instruments, data processing applications, etc., can solve the problems of inability to meet the whole process of engineering cost, lack of evaluation metrics, and inability to comprehensively cover and provide services.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0009] The object of the present invention is achieved through the following technical solutions:
[0010] 1. Unify the cost data collection requirements and specifications for the process of project estimation, budget estimation, budget, and settlement, and collect 3-5 years of cost and technical data within the region to form a typical cost database for main network projects;
[0011] 2. Conduct research and analysis on various types of tenders in the collected typical construction costs, extract data with greater influence as key indicator data, and form a key indicator comparison model;
[0012] 3. Based on the typical cost library and key indicator model, formulate key parameter selection rules, key indicator matching rules, and comparison early warning rules to realize intelligent early warning control of the main network project.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com