Water seepage prevention construction method at the joint surface of underground diaphragm wall by open-cut method and cover-excavation method

An underground diaphragm wall and construction method technology, which is applied in water conservancy projects, artificial islands, underwater structures, etc., can solve the problems of low reliability, large deformation difference, narrow application range, etc., and achieve convenient construction and operation and use less materials , high reliability effect

Active Publication Date: 2016-08-17
CHINA RAILWAY 16 BUREAU GRP BEIJING METRO ENG CONSTR +2
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

"This technology can play an anti-leakage role when the deformation of the two underground diaphragm walls to be connected is basically the same. The deformation of the two underground diaphragm walls is quite different, resulting in tearing of the geomembrane at the interface
Therefore, this technology is only applicable to the case where there is no difference in deformation at the interface of the underground diaphragm wall, the application range is narrow, the reliability is low, the sealing effect of the geomembrane joint is not good, and a large amount of material is wasted, and the efficiency is relatively low

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Water seepage prevention construction method at the joint surface of underground diaphragm wall by open-cut method and cover-excavation method
  • Water seepage prevention construction method at the joint surface of underground diaphragm wall by open-cut method and cover-excavation method
  • Water seepage prevention construction method at the joint surface of underground diaphragm wall by open-cut method and cover-excavation method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0060] The present invention will be described in detail below in conjunction with specific embodiments. The following examples will help those skilled in the art to further understand the present invention, but do not limit the present invention in any form. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present invention. These all belong to the protection scope of the present invention.

[0061] This embodiment provides an anti-seepage construction method at the joint surface of the underground diaphragm wall by the open-cut method and the cover-cut method, which is used in the cover-cut joint construction section of a subway station. This subway station is an island platform station with two floors underground, adopting a frame structure with one column and two spans. In order to reduce the impact on the traffic on the west side of the station, the structure of the station within ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides an anti-seepage construction method of a joint surface between an underground continuous wall of an open-cut method and an underground continuous wall of a cover-excavation method. The method comprises the following steps: forming a deformation joint in the joint surface between the underground continuous wall of the open-cut method and the underground continuous wall of the cover-excavation method to release uneven inner force of the underground continuous walls on the two sides, and tightly pressing an anti-seepage shear block onto the external side of the joint surface between the underground continuous wall of the open-cut method and the underground continuous wall of the cover-excavation method by using the dislocation force generated by deformation differences of the two sides of the underground continuous wall so as to take an anti-seepage effect. The anti-seepage construction method of the joint surface between the underground continuous wall of the open-cut method and the underground continuous wall of the cover-excavation method, provided by the invention, is suitable for situations that difference exists between the deformations of the joint surface between the underground continuous walls, has the advantages that the shearing force generated by relative dislocation of the underground continuous walls is fully utilized, the deformations of the underground continuous walls are limited and the anti-seepage effect is also taken, and also has the advantages of relatively high efficiency, less used materials, lower cost, convenient construction and operation and high reliability.

Description

technical field [0001] The invention relates to a method in the technical field of underground building construction, in particular to an anti-seepage construction method at the joint surface of an underground continuous wall by an open-cut method and a cover-excavation method. Background technique [0002] Among the subway construction methods, the open-cut method has simple construction technology, high construction efficiency, and low engineering cost, but it has a greater impact on the surrounding environment and is not suitable for urban areas with dense traffic. The cover excavation method is a method in which the top is closed after the ground is excavated to a certain depth, and the rest of the substructure is constructed under the closed top cover. The cover-and-excavation method has higher cost and lower construction efficiency, but has less impact on surrounding traffic conditions. Based on the different characteristics of the open-cut method and the cover-excava...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D29/16E02D31/06
CPCE02D29/16E02D31/02
Inventor 李辉邹洪宝汪俊沈水龙史运杰许烨霜郭钦利邢本康马晓松马志珑曹志刚林文雄赵鸿儒冯越钱佳亘李双军张宇彤
Owner CHINA RAILWAY 16 BUREAU GRP BEIJING METRO ENG CONSTR