A method for determining the dynamic load of subway operating trains and long-term settlement of tunnels
A dynamic load and axle dynamic load technology, applied in surveying and mapping and navigation, measuring devices, instruments, etc., can solve the problem of not considering the influence of rails, inability to accurately determine the tunnel settlement, and the number of train cyclic loading does not give a clear and reliable analysis and other problems, to achieve the effect of easy promotion, great application value, and simple method
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0050] A subway tunnel is located in the soft soil layer in the downtown area of Shanghai, and the bottom of the tunnel is buried at a depth of 13.6m. Since its operation, the settlement of the subway tunnel has been increasing. In this embodiment, the corresponding design parameters and soil layer information are obtained first. Specific steps are as follows:
[0051] The first step is to obtain the general situation of subway operating trains and the design parameters of tunnels, ballast beds and tracks.
[0052] The subway line uses A-type trains, which consist of 8 cars. The first and last cars are 23.69m long and have an axle load of 150kN. The remaining six cars are each 22.1m long and have an axle load of 160kN. The distance between the first and second wheel axles is 2.5m, the distance between the second and third wheel axles is 13.2m, and the distance between the third and fourth wheel axles is 2.5m; the operating speed of the train is 60km / h, and the average depa...
PUM
| Property | Measurement | Unit |
|---|---|---|
| elastic modulus | aaaaa | aaaaa |
| elastic modulus | aaaaa | aaaaa |
| elastic modulus | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 