Optimization scheduling method in raw material leaching process for chemical industry production
A technology for optimal scheduling and chemical production, applied in genetic laws, data processing applications, forecasting, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0077] Embodiment 1: as Figure 1-2 As shown, an optimal scheduling method for raw material leaching process in chemical production, by determining the scheduling model and optimization goal of the raw material leaching process, and using the optimal scheduling method based on the adaptive distribution estimation algorithm to optimize the optimization goal; the scheduling model It is established according to the maximum completion time of the processed raw materials on each leaching equipment, and the optimization goal is to minimize the maximum completion time:
[0078] C max ( π ) = max { Σ k = 1 T ...
Embodiment 2
[0095] Embodiment 2: as Figure 1-2 As shown, an optimal scheduling method for raw material leaching process in chemical production, by determining the scheduling model and optimization goal of the raw material leaching process, and using the optimal scheduling method based on the adaptive distribution estimation algorithm to optimize the optimization goal; the scheduling model It is established based on the maximum completion time of the processed raw materials on each leaching equipment, and the optimization goal is to minimize the maximum completion time:
[0096] C max ( π ) = max { Σ k = 1 T 1 ...
Embodiment 3
[0118] Embodiment 3: as Figure 1-2 As shown, an optimal scheduling method for raw material leaching process in chemical production, by determining the scheduling model and optimization goal of the raw material leaching process, and using the optimal scheduling method based on the adaptive distribution estimation algorithm to optimize the optimization goal; the scheduling model It is established based on the maximum completion time of the processed raw materials on each leaching equipment, and the optimization goal is to minimize the maximum completion time:
[0119] C max ( π ) = max { Σ k = 1 T 1 ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com