A priority management system for nuclear power plants
A management system and priority technology, applied in nuclear power generation, power plant safety devices, greenhouse gas reduction, etc., can solve the problems of intelligent actuator disturbance, failure to explain common cause failure, special requirements for actuator selection, etc., to avoid common problems. effect of failure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0055] The invention belongs to one of the product designs of the digital instrument and control system for nuclear power plants independently developed in my country. Its main function is to complete the safety shutdown of the reactor and the control of special safety facilities under accident conditions. The priority management system provided by the invention is mainly used for nuclear power plants Command priority management and interface management between the digital instrument control system and other systems and the drive devices with special safety facilities.
[0056] In this embodiment, the priority management system (hereinafter referred to as CIM) provided by the invention has a quality assurance level of Q1 and a security level of 1E.
[0057] (1) Hardware connection
[0058] Such as figure 1 As shown, CIM receives instructions from safety dedicated drive cabinet ESFAC, safety-related control cabinet SRC, diversified drive control cabinet DAC, severe accident control cab...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com