Fusible high-performance elastomer modified asphalt waterproof roll

A kind of asphalt waterproof membrane and body modification technology, which is applied in the direction of asphalt layered products, layered products, synthetic resin layered products, etc., and can solve the problems of improvement and promotion of modified asphalt construction performance, waste of resources, consumption of fossil fuels, etc. problems, to save energy consumption, reduce production costs, and improve construction efficiency

Active Publication Date: 2015-04-29
TANGSHAN DONGFANG YUHONG WATERPROOF TECH CO LTD +2
View PDF3 Cites 28 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Most of the existing modified asphalt waterproofing membranes are only innovative in structure and function, and have not improved the construction performance of modified asphalt
However, the existing modified asphalt waterproofing membranes need to use natural gas, methane and other non-renewable fuels for hot-melt construction during construction, and the construction temperature often needs to be kept at 2000-3000 °C. This construction method consumes a large amount of fossil fuels, which will inevitably cause waste of resources

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Fusible high-performance elastomer modified asphalt waterproof roll
  • Fusible high-performance elastomer modified asphalt waterproof roll
  • Fusible high-performance elastomer modified asphalt waterproof roll

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0043] Polyester tire specification selection weight is 250g / m 2 , with a thickness of 1.6mm; the upper and lower surface thicknesses of fusible high-performance elastomer modified asphalt are 1.0mm and 1.1mm respectively;

[0044] 1. The compound composition of fusible high-performance elastomer modified asphalt is as follows:

[0045]

[0046] Preparation method of fusible high-performance elastomer modified asphalt:

[0047] (1) 35% petroleum asphalt and 14% natural lake asphalt are heated to 150°C;

[0048] (2) Add 5% naphthenic oil, 8% SBS4402, 5% styrene-butadiene rubber and 2% acrylate rubber in sequence, stir evenly, and heat up to 185°C. Develop at this temperature for 40 minutes, then turn on the colloid mill to accelerate the swelling process and make the modifier more complete.

[0049] (3) Stop the colloid mill after two hours, add 25.8% heavy calcium carbonate and 5% attapulgite, and continue to develop at a temperature of 185° C. for 70 minutes.

[0050] (4...

Embodiment 2

[0064] Polyester tire specification selection weight is 200g / m 2 , with a thickness of 1.2mm; the upper and lower surface thicknesses of the fusible high-performance elastomer modified asphalt are 1.0mm and 1.2mm respectively, and the heat-sensitive fusible OPP isolation film layers on the upper and lower surfaces are both 0.01mm.

[0065] 1. The compound composition of fusible high-performance elastomer modified asphalt is as follows:

[0066]

[0067]

[0068] Preparation method of fusible high-performance elastomer modified asphalt:

[0069] (1) 42% petroleum asphalt and 15% natural lake asphalt are heated to 160°C;

[0070] (2) Add 8% minus first-line engine oil, 12% SBS4402, 5% butadiene rubber and 2% acrylic ester rubber in turn, stir evenly, and heat up to 190°C. Develop at this temperature for 30 minutes, then turn on the colloid mill to accelerate the swelling process and make the modifier more complete.

[0071] (3) Stop the colloid mill after two hours, add...

Embodiment 3

[0086] Polyester tire specification selection weight is 220g / m 2 , the thickness is 1.35mm; the thickness of the mineral granular material layer is 0.7mm, the thickness of the upper and lower surfaces of the high heat-resistant elastomer modified asphalt is 1.1mm and 1.3mm respectively, and the thickness of the heat-sensitive and fusible OPP isolation film layer on the upper and lower surfaces is 0.01mm.

[0087] 1. The compound composition of fusible high-performance elastomer modified asphalt is as follows:

[0088]

[0089]

[0090] Preparation method of fusible high-performance elastomer modified asphalt:

[0091] (1) 40% petroleum asphalt and 11% natural lake asphalt are heated to 160°C;

[0092] (2) Add 5% naphthenic oil, 12% SBS4402, 5% ethylene-propylene rubber and 2% acrylic rubber in sequence, stir evenly, and heat up to 180°C. Develop at this temperature for 45 minutes, then turn on the colloid mill to accelerate the swelling process and make the modifier m...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
Basis weightaaaaaaaaaa
thicknessaaaaaaaaaa
melting pointaaaaaaaaaa
Login to view more

Abstract

The invention discloses a fusible high-performance elastomer modified asphalt waterproof roll. The fusible high-performance elastomer modified asphalt waterproof roll sequentially comprises a heat-sensitive fusible OPP (o-phenylphenol) isolating membrane, a fusible elastomer modified asphalt, a polyester reinforcement, fusible elastomer modified asphalt and a heat-sensitive fusible OPP isolating membrane from top to bottom. When the fusible high-performance elastomer modified asphalt waterproof roll is applied, the construction efficiency can be improved, the energy consumption is reduced, and the waterproof roll is energy-saving, environment-friendly and long in service life and has good economic benefits and social benefits. The experiment proves that the fusible high-performance elastomer modified asphalt waterproof roll disclosed by the invention has the advantage that the construction rate can be improved by 10-20 percent.

Description

technical field [0001] The invention relates to a modified asphalt waterproof coiled material, in particular to a fusible high-performance elastomer modified asphalt waterproof coiled material. Background technique [0002] Elastomer (SBS) modified asphalt waterproofing membrane is based on polyester felt or glass fiber felt, styrene-butadiene-styrene (SBS) copolymerized thermoplastic elastomer is used as modifier, and both sides are covered with polyester. Vinyl film, fine sand, powder or mineral granules (sheets) are used to make modified asphalt waterproofing membranes, which occupy an absolute dominant position in the European waterproofing material market. Except for Italy, other European countries mainly use SBS modification. , The market share is more than 80%, and it is used in various construction projects such as buildings, roads, railways, bridges, airports and subways. my country has introduced the production technology of modified asphalt waterproofing membrane...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): B32B11/04B32B27/06
CPCB32B11/04B32B11/046B32B27/36
Inventor 朱明广李文志段文锋
Owner TANGSHAN DONGFANG YUHONG WATERPROOF TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products