Method of testing transformer before commissioning of intelligent substation
A technology of intelligent substation and testing method, which is applied in the direction of instruments, measuring electricity, measuring devices, etc., can solve the problems of prone to errors and low measurement accuracy, and achieve the effects of reducing error probability, high testing accuracy, and ensuring stable and safe operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0007] The test method of the transformer before the smart substation is put into operation, firstly short-circuit the primary circuit of the low-voltage side of the outdoor transformer, and then connect the AC 0-220V voltage from the primary circuit A of the high-voltage side of the outdoor transformer, so that A on the high-voltage side and low-voltage side of the outdoor transformer A certain AC current value is generated on each phase, and then according to the main wiring mode of the outdoor transformer, the secondary wiring mode of the transformer bushing CT and the parameters of the transformer CT transformation ratio, in the main control room of the indoor substation, the A phase of the high voltage side of the indoor transformer is measured. Bushing CT secondary current and indoor transformer low-voltage side A-phase bushing CT secondary current; then, connect AC 0-220V voltage from the primary circuit B of the high-voltage side of the outdoor transformer, so that B on ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More