Method of testing transformer before commissioning of intelligent substation

A technology of intelligent substation and testing method, which is applied in the direction of instruments, measuring electricity, measuring devices, etc., can solve the problems of prone to errors and low measurement accuracy, and achieve the effects of reducing error probability, high testing accuracy, and ensuring stable and safe operation

Inactive Publication Date: 2015-05-20
STATE GRID CORP OF CHINA +2
View PDF1 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the traditional test method is to draw a hexagonal diagram by measuring the amplitude and phase of the operating load side current after it is put into operation. Through the analysis of the hexagonal diagram, a conclusion can be drawn whether the transformer is installed correctly or not. This kind of testing method exists The disadvantage is that it can only be measured after the transformer is put into operation, and it must be measured after exiting the differential protection. The measurement accuracy is not high and errors are prone to occur.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0007] The test method of the transformer before the smart substation is put into operation, firstly short-circuit the primary circuit of the low-voltage side of the outdoor transformer, and then connect the AC 0-220V voltage from the primary circuit A of the high-voltage side of the outdoor transformer, so that A on the high-voltage side and low-voltage side of the outdoor transformer A certain AC current value is generated on each phase, and then according to the main wiring mode of the outdoor transformer, the secondary wiring mode of the transformer bushing CT and the parameters of the transformer CT transformation ratio, in the main control room of the indoor substation, the A phase of the high voltage side of the indoor transformer is measured. Bushing CT secondary current and indoor transformer low-voltage side A-phase bushing CT secondary current; then, connect AC 0-220V voltage from the primary circuit B of the high-voltage side of the outdoor transformer, so that B on ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method of testing a transformer before commissioning of an intelligent substation. A primary circuit at a low-voltage side of an outdoor transformer is firstly short-circuited, AC0-220 voltage is connected into a primary circuit at a high-voltage side of the outdoor transformer phase by phase, and thus certain AC values are generated on corresponding primary phases at the low-voltage side and the high-voltage side of the outdoor transformer; according to the main wiring mode of the outdoor transformer, a transformer bushing CT secondary wiring mode and transformer CT transformation ratio parameters, in a main control room of an indoor substation, bushing CT secondary current at the high-voltage side of the indoor transformer and bushing CT secondary current at the low-voltage side of the indoor transformer are correspondingly measured phase by phase according to the connection phase of the primary circuit at the high-voltage side of the outdoor transformer, and finally according to current phase values tested on phases, a transformer hexagonal diagram is drawn, and a testing result is analyzed and obtained. The method of the invention has the advantages that the testing precision is high; the testing speed is fast; the testing error probability is greatly reduced; testing can be directly carried out before commissioning; and the transformer can be effectively ensured to operate stably and safely.

Description

technical field [0001] The present invention relates to the technical field of testing methods for electric equipment, and more specifically relates to the technical field of testing methods for transformers. Background technique [0002] According to regulations, when a new transformer is put into operation, the hexagonal diagram of the transformer must be tested to detect the correctness of the transformer wiring during installation, so as to ensure the safe and reliable operation of the transformer. At present, the traditional test method is to draw a hexagonal diagram by measuring the amplitude and phase of the operating load side current after it is put into operation. Through the analysis of the hexagonal diagram, a conclusion can be drawn whether the transformer is installed correctly or not. This kind of testing method exists The disadvantage of this method is that it can only be measured after the transformer is put into operation, and it must be measured after exit...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G01R31/02
Inventor 陈克勇孟慧陈前臣易健雄刘少雷
Owner STATE GRID CORP OF CHINA