A ctcs‑3 train control vehicle real-time information extraction device
A real-time information, train technology, applied in electrical program control, comprehensive factory control, program control in sequence/logic controllers, etc., can solve problems such as errors, information errors, and emergency braking distances become longer.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] Example 1: as figure 1 shown:
[0038] The preferred embodiment of the present invention includes an actual operation monitoring unit, a train state receiving unit, a geological data analysis unit, a train approach unit, a natural environment data collection unit, a train information crawling unit, a search strategy unit, and a risk decision unit. Four major parts, each of which performs different functions independently.
[0039] like image 3 as shown, refer to figure 1 and figure 2 , the data must be crawled before the decision in this embodiment, and the error or risk-related data must be identified before the crawling. For example, conventional safety information includes six categories of train speed information, train position information, basic train parameters, line data, and driving environmental conditions. We not only consider these six categories in actual operation, but these six categories are only for trains. In fact, it also includes track safety ...
Embodiment 2
[0050] Example 2: as Figure 4 shown:
[0051] like Figure 4 As shown, in addition to Embodiment 1, in practice, the CTCS-3 train control vehicle real-time information extraction method and device also consider other equipment and the considered data, which includes an actual operation monitoring unit, a train state receiving unit, A geological data analysis unit, a train approach unit, a natural environment data collection unit, a train information crawling unit, a search strategy unit, and a risk decision-making unit; from the perspective of the entire system for the collection and analysis of erroneous data, it is not necessary to These systems are limited, including several industrial cameras (not shown in the figure) and a video capture card (not shown in the figure). In railway construction, high-performance speed sensors are generally used to obtain real-time train running data and convert them into digital signal, which is provided to the onboard computing system. ...