A multi-temporal co-existing railway station layout plan management method
A technology of railway station and management method, applied in the field of track management, which can solve the problems of unfavorable expansion of the division of track attributes, lack of historical continuity, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] Such as figure 1 Shown is a flow chart of a multi-temporal co-existing railway station plan track management method provided by the present invention, wherein the track sub-curve includes design attributes and temporal attributes, and one or more segment track sub-curves are based on their own design attributes. The starting point data and the end point data form a structural chain of the stock track, and the method comprises the following steps:
[0026] In step 201, the channel sub-curves are divided into one or more groups of channels according to the temporal attributes.
[0027] Wherein, the temporal attribute includes present tense, recent tense and future tense. In an optional solution, the temporal attributes include: multi-temporal attributes such as existing, new, recent stock market, and long-term stock market. In each embodiment of the present invention, only the current tense, recent The description of the three situations of tense and future tense, and t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

