Device for measuring concrete grouting height of tube-sinking cast-in-situ pile in real time and using method of device
A technology of immersed tube grouting piles and real-time measurement, which is applied in the direction of foundation structure testing, construction, foundation structure engineering, etc., can solve the problems of difficult measurement of concrete pouring height, and achieve simple and feasible technology, strong practicability and high precision Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] A real-time measuring device for concrete pouring height of immersed tube pouring piles, including a take-up box 1, a scale 2, a weight 3, and 3 fixed pulleys 4, 2 fixed pulleys 4, and one fixed pulley 4 fixed on the pile machine frame 5, the other is fixed on the pile frame to change the direction of the scale 2, one end of the scale 2 passes through two fixed pulleys 4 to connect with the weight 3, and the other end is connected to the take-up box 1; the take-up box 1 is used to retract the scale 2, and the heavy hammer 3 is located directly above the pile formwork of the immersed tube grouting pile, so as to ensure that the heavy hammer 3 falls into the pile mold of the immersed tube grouting pile after falling.
[0040] The scale 2 adopts a tape measure.
[0041] The heavy hammer 3 is made of poured concrete, which sinks freely in the water and floats in the concrete, which makes the measurement result more accurate.
[0042] When measuring, both ends of the scale 2 ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 