Nuclear power plant hoisting trolley with double wire rope winding system
A lifting trolley and steel wire rope technology, which is applied in the field of crane trolleys in nuclear power plants, can solve the problems of large parameters such as pulley diameter and drum torque, uneconomical, large models, etc., to reduce equipment manufacturing and maintenance costs and wide application range Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] like Figure 5 , 6 , 7 shown. The nuclear power plant hoisting trolley with double-type wire rope winding system includes a trolley frame 9, a hoisting drive mechanism 10, a wire rope winding system 11, a trolley operating mechanism 12 and a spreader. The spreader includes a hook and a bracket 13. The hook is installed on the At the center of the bracket 13, the two sides of the bracket 13 are divided into eight hoisting position areas, which are respectively area I1, area II2, area III3, area IV4, area V5, area VI6, area VII7 and area VIII8, wherein area I1, area VI6, area VII7 and area IV4 are arranged in order on one side, area V5, area II2, area III3 and area VIII8 are arranged in order on the other side, the hoisting drive mechanism 10 is two sets, and the hoisting drive mechanism 10 is composed of a motor and a reducer The hoisting drive mechanism 10 is installed on the trolley frame 9, the trolley running mechanism 12 is installed on both ends below the trolley...
Embodiment 2
[0033]Basically the same as Example 1, except that the transition pulley group I4.1 is a balance beam I4.1-1, the transition pulley group IV4.4 is a balance beam IV 4.4-1, and the wire rope I6.1 is placed at the balance beam I4.1-1. For 2, the front of the balance beam I4.1-1 is the steel wire rope I-16.1-1, the back of the balance beam I4.1-1 is the steel wire rope I-2 6.1-2, the steel wire rope I-1 6.1-1 and the steel wire rope I- 2 6.1-2 is connected at both ends of balance beam I 4.1-1; steel wire rope II6.2 is divided into 2 at balance beam IV4.4, the front of balance beam IV4.4 is steel wire rope II-1 6.2-1, balance beam IV 4.4 The latter is the wire rope II-2 6.2-2, the wire rope II-16.2-1 and the wire rope II-2 6.2-2 are connected at both ends of the balance beam IV4.4. like Figure 9 shown.
Embodiment 3
[0035] It is basically the same as the embodiment 2, except that the reel group I1.1 or the reel group II1.2 is a double-drum single-reeling method of winding a wire rope for each reel, and the wire rope 6.1 is wound on the reel group I-1. On 1.1-1 and reel group I-2 1.1-2, wire rope 6.2 is wound on reel group II-1 1.2-1 and reel group II-2 1.2-2. like Figure 10 shown.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



