A Construction Method of Demand Response Scheduling Evaluation System for Simulated Peaking Units

A peak-shaving unit and demand-response technology, applied in the field of power system, can solve problems such as fluctuation of dispatching capacity, overestimation of demand-response resources, and strong uncertainty of demand-response resources.

Active Publication Date: 2017-12-01
STATE GRID CORP OF CHINA +5
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Demand response resources have the characteristics of strong uncertainty, scattered resources, small virtual power generation capacity, and weak readjustment ability. After aggregation, within the scheduling time, there may be users who suddenly withdraw from demand response, or do not participate in demand response, or The degree of participation does not meet the pre-requirements, etc., which may cause fluctuations in dispatching capacity, affect the confidence level of simulated peak-shaving units, and bring certain pressure to peak-shaving dispatching
Therefore, in ideal scheduling, demand response resources cannot be overestimated or underestimated. Overestimation will lead to more traditional standby units participating in dispatching, thereby increasing dispatching costs; underestimation will fail to make full use of demand response resources. It is difficult to realize the original intention of demand response resources

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A Construction Method of Demand Response Scheduling Evaluation System for Simulated Peaking Units
  • A Construction Method of Demand Response Scheduling Evaluation System for Simulated Peaking Units
  • A Construction Method of Demand Response Scheduling Evaluation System for Simulated Peaking Units

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0083] The present invention will be further described below in conjunction with the accompanying drawings.

[0084] A method for constructing a demand response dispatch evaluation system for simulating peak-shaving units, comprising the following steps:

[0085] Step 1: Determine the evaluation time of demand response scheduling, that is, the total time of ideal peak shaving;

[0086] Let the response time be 2 hours, let 5min be a time period, set 1Δt=5min, and respond at the starting time T s , the response end time T f , that is, the response scheduling evaluation time T f -T s = 24Δt;

[0087] Assume Then the first response period is The second response period is And so on, the 24th response period is

[0088] Step 2: Aiming at the simulated peak-shaving unit, construct a three-level demand response scheduling evaluation system for the simulated peak-shaving unit from the time dimension, capacity dimension and object dimension: the first level is the overall ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for constructing a demand response scheduling evaluation system of a simulated peak-shaving unit, including: determining the demand response dispatch evaluation time; taking the simulated peak-shaving unit as the target, and constructing three levels from the time dimension, the capacity dimension and the object dimension The demand response dispatching evaluation system of simulated peak-shaving units: the first layer is general indicators; The evaluation system of demand response dispatching; the evaluation method of attribute interval recognition theory is used to analyze the index system and carry out dispatching evaluation calculation. The demand response scheduling evaluation system of the simulated peak shaving unit constructed by the method of the present invention has comprehensiveness, independence, ease of measurement, flexibility and practicability, and is helpful for power grid scheduling to understand demand response scheduling results and user responses more intuitively State, providing a scientific and accurate basis for the implementation of demand response and settlement.

Description

technical field [0001] The invention relates to a method for constructing a demand response scheduling evaluation system for a simulated peak-shaving unit, and belongs to the technical field of electric power systems. Background technique [0002] Under the double influence of the contradiction between power supply and demand, the cost of traditional peaking units, and the limitation of environment and resources, load dispatching is becoming a new element of power grid dispatching. Compared with conventional power generation resources, demand response resources have certain advantages in participating in power grid operation control. For example, when conditions permit, demand response resources can quickly respond to scheduling and control instructions, and the capacity of demand response resources after aggregation is adjustable and flexible; at the same time , due to the scattered distribution of demand response resources, it can be optimized and aggregated from the netwo...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06F19/00
Inventor 陈璐杨永标周静黄莉王珂颜盛军郭晓蕊黄伟兵
Owner STATE GRID CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products