Arc door hinged girder structure of high-speed water discharge tunnel buried underground
A technology of high-speed water flow and girders, applied in water conservancy projects, sea area projects, coastline protection, etc., can solve the problems of unfavorable surrounding rock stability and inability to ensure the clearance of the cave roof, so as to facilitate construction safety, ensure flood discharge operation safety, conducive to stabilizing effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] The present invention will be further described below in conjunction with accompanying drawing.
[0018] Such as figure 1 and figure 2 As shown, the present invention includes a bedrock rock wall and a hinged girder 1, and the hinged girder 1 is arranged across the bedrock rock wall; the hinged girder 1 is arched, and the top surface 11 of the hinged girder 1 Both the bottom surface 12 and the bottom surface 12 are downwardly curved arc surfaces. The figure of the present invention when concrete application is visible image 3 and Figure 4 As shown, after the construction and installation of the present invention, the water thrust borne by the arc gate 2 can be transmitted to the rock wall through the arc gate hinge support plate 13 on the arc gate hinge girder 1, and the surface of the hinge girder 1 is generally set 1~2 arc door hinge supporting plates 13 get final product, like this, can improve the stressed situation of supporting hinge girder and side wall. ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


