Construction method of split start of shield machine in narrow space
A construction method and split-start technology, applied in earth-moving drilling, mining equipment, tunnels, etc., can solve the problems of the narrow net width of the starting station structure and the inability of the vehicle frame to pass through the station smoothly as a whole, so as to reduce the number of reconstructions and The effect of connecting length and shortening construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0009] In order to further describe the split starting construction method of the small space shield machine of the present invention, it will be further described below in conjunction with the accompanying drawings.
[0010] see figure 1 As shown, a split starting construction method of the shield machine in a small space, the left and right sides of the No. 1, No. 2, No. 3, and No. 5 trolleys of the shield machine are disassembled, and they correspond to the pre-made empty trolleys respectively. Assembled, the frame width of the shield machine was changed from 4.5m to 3.8m, and then hoisted into the underground for assembly in order, and the remaining auxiliary trolleys were placed on the ground near the starting well, and then the pipes between the trolleys were connected. After the shield machine has been debugged, the start is started. After the 40 rings (60m) of the shield machine start are completed, the upper half of the negative ring segment is removed, and the trolle...