A support method for rock roadway support using adjustable bolts
An adjustable, bolt technology, applied in the installation of bolts, earthwork drilling, mining equipment, etc., can solve the problems of complex methods, low work efficiency, time-consuming and laborious, and achieve the effect of simple methods and improved work efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0014] 75g coal mine permitted explosive 6 and safety electric detonator 7 are installed in the charge end 4 of anchor rod 1, the first chemical preparation 10 and the second chemical preparation 11 of plastic packaging are placed in the middle of buffer device 9 and loess gun mud 12, and then Connect the anchor rod 1 with the connecting rod 2, connect the connecting rod 2 with the fastening rod 3, lead the detonator foot wire 8 of the safety electric detonator 7 out of the rod body, and detonate the coal mine permitted explosives contained in the charging end 4 through the safety electric detonator 7 6. The energy released by the explosion makes the charging end 4 of the anchor rod cut into four expanded pieces with slits tightly combined with the surrounding rock. When the bag is broken, the first chemical preparation 10 and the second chemical preparation 11 are fully mixed to undergo a chemical reaction to form an expansion material with good flame retardant effect, compres...
Embodiment 2
[0016] The coal mine roadway is coal mine hard rock, 100g of coal mine permitted explosive 6 and safety electric detonator 7 are installed in the charge end 4 of the anchor rod 1, and the first chemical agent 10 of plastic packaging is placed between the buffer device 9 and the loess gun mud 12 and the second chemical preparation 11, then the anchor rod 1 is connected with the connecting rod 2, the connecting rod 2 is connected with the fastening rod 3, the detonator foot wire 8 of the safety electric detonator 7 is drawn out of the rod body, and the charge is detonated by the safety electric detonator 7 End 4 is equipped with coal mine explosives 6. The energy released by the explosion makes the four expanded pieces of the anchor rod 1 cut with slits tightly combined with the surrounding rock. At the same time, the energy released by the explosion makes the first chemical The bags of preparation 10 and the second chemical preparation 11 are broken, and the first chemical prepa...
Embodiment 3
[0018] The coal mine roadway is the soft rock of the coal mine, 50g coal mine permitted explosive 6 and safety electric detonator 7 are installed in the charging end 4 of the anchor rod 1, and the first chemical agent 10 of plastic packaging is placed between the buffer device 9 and the loess gun mud 12 and the second chemical preparation 11, then the anchor rod 1 is connected with the connecting rod 2, the connecting rod 2 is connected with the fastening rod 3, the detonator foot wire 8 of the safety electric detonator 7 is drawn out of the rod body, and the charge is detonated by the safety electric detonator 7 End 4 is equipped with coal mine explosives 6. The energy released by the explosion makes the four expanded pieces of the anchor rod 1 cut with slits tightly combined with the surrounding rock. At the same time, the energy released by the explosion makes the first chemical The bags of preparation 10 and the second chemical preparation 11 are broken, and the first chemi...
PUM
| Property | Measurement | Unit |
|---|---|---|
| compressive strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 


