A method for emergency repair of embankment along the river based on the use of containers
A container and line technology, applied in dikes, roads, excavation, etc., can solve the problems of poor anti-scourability, poor repair timeliness, inconvenient material collection, etc., and achieve strong anti-scourability, convenient material collection, and strong integrity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] In order to facilitate transportation and placement, a 20-foot standard container is used for the container abutment, and the structural size of this type of container is about 6m×2.4m×2.4m. A maximum of two layers of stacking shall be used, and the number of containers on each layer shall be determined according to the geological conditions of the embankment base. Among them, the number of container embankments stacked, as shown in Table 1 below,
[0028] Table 1
[0029]
[0030] Fill the embankment with a container filled with sand and gravel. When the height of the top surface of the container is higher than the height of the original road surface, adjust the height of the embankment by excavating the earthwork at the bottom of the container; It can be stacked up to two layers with a height of 4.8m. The container frame structure has a large load-bearing capacity, and the corners around it can play a role in restraining lateral movement; (2) When the total mass ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

