Building pile
A technology for building piles and pile bodies, which is applied in construction, sheet pile walls, infrastructure engineering, etc., can solve the problems of high risk, the whole building is out of use, and the construction period is long, so as to improve safety and stability. , the effect of ensuring integrity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] refer to figure 1 As shown, a construction pile includes a pile head 1, a pile body 2 and a load-bearing mechanism 3, the pile head 1, the pile body 2 and the load-bearing mechanism 3 are connected in sequence, and the bottom side wall of the pile body 2 is provided with a grip A ground mechanism 4, the inside of the pile body 2 is provided with a shock absorbing pipe 5 and two connecting anchor pipes 7, a reinforcing column 6 is arranged between the two connecting anchor pipes 7, and a bracket 8 is arranged on the top of the pile body 2 , a load-bearing platform 10 is arranged above the support 8, and a spring 9 is used to connect the load-bearing platform 10 and the bracket 8. A top post 11 is arranged on the support platform 10, and a top plate 13 is provided on the top of the top post 11. Ribs 12 are provided on both sides of the top column 11 .
[0023] The pile head 1 and the pile body 2 are connected by thread structure, which is beneficial to the disassembly an...
Embodiment 2
[0036] refer to figure 1 As shown, a construction pile includes a pile head 1, a pile body 2 and a load-bearing mechanism 3, the pile head 1, the pile body 2 and the load-bearing mechanism 3 are connected in sequence, and the bottom side wall of the pile body 2 is provided with a grip A ground mechanism 4, the inside of the pile body 2 is provided with a shock absorbing pipe 5 and two connecting anchor pipes 7, a reinforcing column 6 is arranged between the two connecting anchor pipes 7, and a bracket 8 is arranged on the top of the pile body 2 , a load-bearing platform 10 is arranged above the support 8, and a spring 9 is used to connect the load-bearing platform 10 and the bracket 8. A top post 11 is arranged on the support platform 10, and a top plate 13 is provided on the top of the top post 11. Ribs 12 are provided on both sides of the top column 11 .
[0037] The pile head 1 and the pile body 2 are connected by thread structure, which is beneficial to the disassembly an...
Embodiment 3
[0050] refer to figure 1 As shown, a construction pile includes a pile head 1, a pile body 2 and a load-bearing mechanism 3, the pile head 1, the pile body 2 and the load-bearing mechanism 3 are connected in sequence, and the bottom side wall of the pile body 2 is provided with a grip A ground mechanism 4, the inside of the pile body 2 is provided with a shock absorbing pipe 5 and two connecting anchor pipes 7, a reinforcing column 6 is arranged between the two connecting anchor pipes 7, and a bracket 8 is arranged on the top of the pile body 2 , a load-bearing platform 10 is arranged above the support 8, and a spring 9 is used to connect the load-bearing platform 10 and the bracket 8. A top post 11 is arranged on the support platform 10, and a top plate 13 is provided on the top of the top post 11. Ribs 12 are provided on both sides of the top column 11 .
[0051] The pile head 1 and the pile body 2 are connected by thread structure, which is beneficial to the disassembly an...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com