Temporary plugging structure and construction method of support pile gap
A technology of supporting piles and gaps
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0037] In order to facilitate the understanding of the present invention, the following description is given in conjunction with the drawings and embodiments.
[0038] See Figure 1A to Figure 5C The present invention provides a temporary plugging structure for supporting pile gaps and a construction method thereof, wherein the temporary plugging structure is formed in such as Figure 1A , 1B Between the soil body 10 of the foundation pit and a plurality of supporting piles 20 arranged in front of the soil body 10; Figure 2A to Figure 5C As shown, the temporary blocking structure for the supporting pile gap of the present invention includes a first steel bar 30, a second steel bar 40, a template 50 and a wooden wedge 60.
[0039] It should be noted that, in the present invention, the first steel bar 30 also includes planted steel bar, planted steel bar or other steel bar that means planted bar on the supporting pile, and the second steel bar 40 also includes steel bar, horizontal R...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


