Configuration method and system of floor construction organization plan
A technology of organizational planning and configuration methods, applied in computing, instrumentation, data processing applications, etc., can solve problems such as labor and time-consuming, time-consuming and labor-intensive, and lack of associated list sub-item component functions, so as to improve efficiency and avoid artificial Errors, the effect of reducing manual operation time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] See figure 1 The configuration method of a floor construction organization plan proposed in the first embodiment mainly includes the following steps S100 to S500:
[0045] S100. Establish a construction organization plan of the reference layer in the standard layer, and associate the construction organization plan of the reference layer with the corresponding bill of quantities and related components in the BIM model.
[0046] In this embodiment, step S100 may specifically include the following steps S110 to S130 for reference:
[0047] S110. Establish the construction organization plan of the reference layer in the standard layer, and select the engineering quantity list of the professional type corresponding to the construction organization plan of the reference layer.
[0048] The construction organization plan of the reference layer can be established in a conventional manner. Different professional types correspond to different bills of quantities, such as bills of quantiti...
Embodiment 2
[0072] See figure 2 , The configuration system of a floor construction organization plan proposed in the second embodiment mainly includes a reference floor construction organization plan establishment module 10, a reference floor component association module 20, a reference floor engineering quantity list association module 30, a copy parameter setting module 40, and copy Layer construction organization plan establishment module 50, copy layer component association module 60, and copy layer engineering quantity list association module 70; each module is introduced as follows:
[0073] Reference layer construction organization plan establishment module 10, used to establish the construction organization plan of the reference layer in the standard layer;
[0074] The reference layer component association module 20 is used to associate the construction organization plan of the reference layer with related components in the BIM model;
[0075] Reference layer engineering quantity list...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com