Rapid construction method for earth-retaining wall
A kind of retaining wall, fast technology, applied in artificial islands, water conservancy projects, infrastructure projects and other directions, can solve the problems of low construction efficiency, slow construction speed, high personal safety risk, save concrete volume, fast construction speed, cost reduction effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, the specific implementation manners of the present invention will now be described in detail with reference to the accompanying drawings.
[0026] Such as Figure 1-3 Shown, the method for fast construction of retaining wall of the present invention may further comprise the steps:
[0027] S1, set up scaffolding, and then set up formwork 1;
[0028] S2. Fix a plurality of grouting pipes 3 between the formworks 1, and set drain holes on the formworks 1. The grouting pipe 3 is a grouting hose, and its surface is provided with a plurality of grouting holes 5, and the multiple grouting pipes 3 are arranged in a plum blossom shape, and the arrangement distance of the grouting pipes 3 is not greater than two-thirds of the height of the retaining wall , to ensure the speed and uniformity of grouting.
[0029] S3. Fill the block 2 into the formwork 1. The diamet...