Flow construction method for forming cast-in-place bored pile for gravel-decomposed rock stratum in double-machine combined mode

A technology of bored piles and pebble gravel, which is applied to drilling equipment and methods, rotary drilling rigs, sheet pile walls, etc., which can solve the problems of easy pollution of the environment due to mud discharge, high rent of high-power hydraulic auger drilling rigs, and prolongation of pile-forming time and other issues, to achieve high economic value and social benefits, shorten the lease time, and improve the effect of construction quality

Inactive Publication Date: 2017-05-17
江苏省岩土工程公司
View PDF4 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Rotary drilling rigs have fast hole formation and strong rock-breaking ability, but the construction noise is large, and the formation is greatly disturbed during drilling, and holes that are easy to collapse are drilled in pebbles and gravel layers; positive circulation and reverse circulation drilling rigs use mud protection to maintain pile holes. wall integrity, but the hole formation rate is low, there are problems such as mud discharge is easy to pollute the environment, and the existence of mud in the hole can easily lead to bedrock softening; it is difficult for long auger drilling rigs to break rocks in rock formations; , The drilling rate is higher in relatively complete strata, the disturbance to the stratum is small, the hole quality is high in the gravel layer, and the construction noise is low, but when the drill pipe of the high-power hydraulic auger drill is used to pump the pile body concrete in the hole, it often occurs. Due to the scheduling of concrete transport vehicles, traffic congestion and other problems, the pile-forming time is prolonged and the piling efficiency is reduced, and the rent of high-power hydraulic auger drilling rigs is high, and the economic benefit of using high-power hydraulic auger drilling rigs for single-machine piling is poor

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0019] 1. Preparatory work before construction

[0020] Arrange power distribution equipment to meet the construction power load of high-power hydraulic auger drilling rigs, long auger drilling rigs and concrete ground pumps.

[0021] Level the site and harden the road. The working face meets the space requirements for equipment deployment and the foundation bearing capacity requirements during equipment construction.

[0022] Plan the production site of the steel cage to facilitate the threading and lifting of the steel cage. Guarantee the quality of the reinforcement cage and meet the technical requirements for vibration post-insertion.

[0023] According to the drawing coordinates, use the total station, theodolite and other equipment to stake out the pile position and mark the center of the pile for the alignment of the drilling rig.

[0024] 2. Drilling with high-power hydraulic auger drilling rig

[0025] The high-power hydraulic auger is aligned in place. By manipu...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a flow construction method for forming a cast-in-place bored pile for a gravel-decomposed rock stratum in a double-machine combined mode. The flow construction method comprises the steps that a high-power hydraulic spiral drilling machine is adopted to conduct drilling; drilling is conducted to the design pile bottom elevation; the requirements of a design and related specifications for the length of the pile and a bearing course at the pile end are met; pore-forming is finished; a drilling rod is lifted out; residue soil produced by pore-forming with the high-power hydraulic spiral drilling machine is layered again and poured in a pile hole through equipment such as an excavator, the speed rate of backfill is controlled, and the filling quality of backfill soil to the pile hole is guaranteed; after a pile position is rechecked and set out again, a long spiral drilling machine is adopted to conduct drilling again on the backfill hole position and pile body concrete is pumped into the pile hole through the end of a drilling rod of the long spiral drilling machine; the pouring top face of the pile body concrete is 0.5-1 m higher than the design pile top elevation; after pumping is finished, a reinforcement cage is lowered to the design elevation trough the method that after vibrating, the reinforcement cage is inserted into the pile body concrete; and the steps are repeated, so that pile-forming flow construction is realized through the combination of the high-power hydraulic spiral drilling machine and the long spiral drilling machine.

Description

technical field [0001] The invention relates to a pile-forming construction method of bored piles in construction engineering, and belongs to the technical field of construction. Background technique [0002] With the increasing shortage of planned land and the increasing load of building functions, the application of deep foundations is becoming more and more extensive. The bored pile is the main component of the deep foundation force transmission and deformation control structure, and the pile quality of the bored pile directly determines the safety and durability of the load-bearing structure of the building. [0003] The existing bored pile forming technology often adopts the method of single drilling rig forming pile. Rotary drilling rigs have fast hole formation and strong rock-breaking ability, but the construction noise is large, and the formation is greatly disturbed during drilling, and holes that are easy to collapse are drilled in pebbles and gravel layers; posi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/34E21B3/02
CPCE02D5/34E21B3/02
Inventor 李彤刘雪珠胡勇柴立计王兵陈胜
Owner 江苏省岩土工程公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products