An anti-seepage structure device for pre-buried sewer pipes in toilet floor
A toilet and floor slab technology, applied in the field of water supply and drainage of housing construction, can solve the problems of reducing the bonding effect between PVC pipes and surrounding concrete
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0009] Control attached figure 1 , the outer cylindrical surface of the stainless steel lining sleeve 2 is consolidated with the toilet floor 1, the upper end of the stainless steel lining sleeve 2 is connected with the upper stainless steel sealing cover 3 screw buckles, the lower end of the stainless steel lining sleeve 2 is connected with the lower stainless steel sealing cover 4 screw buckles The bottom seepage box 5 is fixed on the bottom of the lower stainless steel sealing cover 4, one end of the V-shaped seepage diversion pipe 6 is connected to the bottom of the bottom seepage water box 5, the other end of the V-shaped seepage diversion pipe 6 is arranged in the sewer pipe 7, and the upper part The surface of the outer column of the colloid anti-seepage ferrule 8 is extruded and contacted with the stainless steel inner sleeve pipe 2, the surface of the inner column of the upper colloid anti-seepage ferrule 8 is extruded and contacted with the outer surface of the downpi...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 