A curtain grouting and curtain technology, applied in the field of water conservancy and hydropower, can solve the problems of increasing the amount of excavation and support, affecting the construction progress, secondary excavation, etc., so as to reduce the amount of excavation and lining, and avoid secondary excavation. The effect of excavation and speeding up the construction progress
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] Such as Figure 1-4 As shown, a curtain grouting method suitable for both sides of the dam, including the following steps:
[0032] a) The first row of grouting flat holes 1 is set on both sides of the dam, and the second row of grouting flat holes 2 is set in the area where the curtain bottom line 10 is deep and located below the first row of grouting flat holes 1. The first row of grouting flat holes 1 and The axes of the second row of grouting flat holes 2 are parallel, and the distance Y is between the horizontal projections of the first row of grouting flat holes 1 and the second row of grouting flat holes 2;
[0033] b) A connected branch hole 5 is set at the tail of the second row of grouting flat holes 2;
[0034] c) Drill holes in the first row of grouting flat holes 1 and perform vertical curtain grouting to form the first curtain 3; for the area where the depth of the curtain bottom line 10 is small, grout directly to the curtain bottom line directly below t...