A butt joint construction method of Bailey arch frame
A construction method and beret technology, applied in the erection/assembly of bridges, buildings, bridge construction, etc., can solve the problems of less docking, difficult docking, and many docking times, so as to reduce related problems, reduce assembly time, The effect of horizontal integrity improvement
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0036] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0037] A kind of butt joint construction method of Bailey arch frame of the present invention, such as Figure 1 ~ Figure 3 shown, follow the steps below:
[0038] step 1
[0039] The worker assembles the single-row single-layer Bailey sheet 7 and the transverse connection support frame 8 at the shore abutment to form the assembled Bailey frame 1, and installs the arch closing and docking device 6 at the female end joint of the Bailey frame;
[0040] step 2 ...